Representative Works

  • 2007 – 2013 -  Complex works on ventilation system modernization of Nuclear Fuel Plant Pitesti, including design, installation, technological tests, commissioning and personnel training
  • 2009 – Disassembling/dismantling works of installations/equipments from Hall 1 of The Nuclear Fuel Plant Pitesti
  • 2011 – 2012 – Upgrading and refurbishment of The Nuclear Waste Treatment Station (NWTS) – ventilation and air conditioning installation and its related automation installation – from the Nuclear Research Institute Pitesti (NRI Pitesti)
  • 2011 – 2013 – Making the installation of cooling water recirculation from the assembly area, including design, installation, technological tests, commissioning and personnel training, on The Nuclear Fuel Plant Pitesti
  • 2012 – 2013 – Rehabilitation of the air conditioning system from the TANDEM Accelerator of The Institute for Physics and Nuclear Engineering (IPNE – HH) Bucharest – Magurele